India: Replace 58,000 MU Thermal With 30 GW RE

By 2025-26, India Wants High Cost Thermal Power To Be Replaced By 30 GW Renewables

India’s Ministry of Power (MoP) has unveiled a trajectory to replace about 58,000 million units (MU) of thermal energy from